Our History

Incorporated in 1995 humble with a humble strength of 5 employees and a 25 lakh seed capital, Mr Surender Pal Singh commenced small scale solar home lighting integration. The first solar panel rolled out in 1998 and went to NREDCAP and is still a novel sight to see.

Need this picture (Black and White Pic of solar module manufactured in 1998)

The Chronology of events since then is as enumerated below

  • 1998 – Assembly line for small scale module manufacturing established at Balanagar, Hyderabad
  • 1999 – Export of solar modules commenced
  • 2001 – Bagged World bank project for supply of solar lantern worth Rs 7.5 cr
  • 2004 – Export Orient Unit Commenced
  • 2005 – 3 MW Assembly line and module manufacturing unit commenced at Dundigal.
  • 2006- Best Export Performance Award
  • 2007- Increase module manufacturing capacity to 50 MW

News article in Financial Times 2007 (attached)

  • 2008 – Company awarded ISO certificate
  • 2009- MNRE Channel Partner Status
  • 2010 – Participated in JNNSM Phase 1 and won a tender
  • 2011- Diversified into Solar EPC through subsidiary Premier Solar Powertech Pvt Ltd
  • 2012- Established a solar power plant of 2 MW in Jharkhand
  • 2013 – Purchased a fully automated module manufacturing line and increased production capacity to 75 MW per year